Sample — 12FPC322Q0049

Desiccant Dehumidifier System Replacement Project Plant Material Center, Tucson, AZ

This is a sample from a closed solicitation, chosen by a stated rule rather than picked: closed for at least three days, NAICS 238220, at least 25 obligations located, the stored and counted totals in agreement, at least three source documents still held, and the package built and its own numbers agreeing before anything is published.

Agency AGRICULTURE, DEPARTMENT OF · Posted 2026-09-04 · Responses were due 2026-09-16

The notice: https://sam.gov/opp/17da044ffd3546dd86981d5f1b5f98c6/view

This solicitation is numbered two ways and we do not pick one. SAM’s solicitation number field says 12FPC322Q0049. The agency’s own attached documents are named 12FPC326Q0049. The notice link above resolves to one notice either way.

What the package holds

Requirements, each cited23
Standard clauses, on their own sheet2
Conditions that disqualify4
Scored but never requested2
Documents held3
Documents read3

25 obligations were located: 23 requirements and 2 standard clause(s). The clauses are real obligations, but they are the same in every solicitation of this kind and are not scored, so they are filed separately rather than counted twice.

Scored, but never requested

The evaluation scores these. The instructions never ask you to write them. It is the part you cannot find by reading the solicitation straight through.

10 of the 23 requirements

Each carries the document, the page and — where this solicitation numbers its own paragraphs — the paragraph it was read from. The solicitation is public — turn to any of them and check it.

#DocumentPageParaRequirement
1C04_12FPC326Q0049_Solicitation.pdf29the document does not say(2)If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.
2C04_12FPC326Q0049_Solicitation.pdf29the document does not say(1)If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.
3C04_12FPC326Q0049_Attachment_1_Statement_of_Work.pdf3the document does not sayThe Vendor shall be responsible for any damage or loss of Government or private property which may attribute to them due to negligence while executing the provisions of the contract.
4C04_12FPC326Q0049_Attachment_1_Statement_of_Work.pdf43.1.33.1.3 The vendor shall ensure all full-face contact pressure seals separate the dehumidification process and reactivation air streams and eliminate detrimental leakage of air or moisture with static pressure differentials of up to 3" of water gauge.
5C04_12FPC326Q0049_Attachment_1_Statement_of_Work.pdf43.1.43.1.4 As per proposal, Vendor shall provide and install all new control wiring, new humidistat, necessary controllers, and four (4) each portable hygrometers with operating temperatures that withstand the inside walk in cooler conditions to test inside humidity correct readings.
6C04_12FPC326Q0049_Attachment_1_Statement_of_Work.pdf4the document does not sayVendor shall provide, mount and connect humidistat controller, and remove old humidistat with associated parts.
7C04_12FPC326Q0049_Attachment_1_Statement_of_Work.pdf43.1.53.1.5 Vendor shall ensure new humidistat is properly calibrated to ensure accurate reading of inside relative humidity levels.
8C04_12FPC326Q0049_Attachment_1_Statement_of_Work.pdf43.1.63.1.6 Vendor shall provide and install necessary electrical conduit parts using existing electrical panel with 240V available for new dehumidifier unit.
9C04_12FPC326Q0049_Attachment_1_Statement_of_Work.pdf53.23.2 The vendor shall completely disassemble and disposed of the existing inoperable dehumidifier system and associated materials within standards of local, state, and federal laws, and industry best practices.
10C04_12FPC326Q0049_Attachment_1_Statement_of_Work.pdf5the document does not sayVendor shall replace all necessary air lines to and from the cooler and vent to the outside.

10 of 23 shown. The rest are in the workbook.

Every document, and what happened to it

A document that stated no obligations stated none. It was not skipped, and the package says which is which.

Send us the solicitation you are working on

That opens an email, with your questions first. We reply with what we can and cannot find in it before anyone pays anything. This sample is closed and is not for sale; what a package costs is on the front page.

This page is checkable

Built 2026-09-22T23:15:18+00:00 · package sha256 b0baa43737f4053c07bfddc1bffcfdbe · 236,567 bytes

Every number above was read out of that package, not out of a database. It makes no determination of compliance; the offeror is solely responsible for that before submission.